2027 planning guide — evidence checked 20 November 2026

How to Verify an LLM Vendor's Security and Residency Claims

A four-step method for turning a vendor claim into a recordable fact: name the artefact, fix the period, state the scope, cite the source. All Plugsky wording on this page uses the approved formulation and is marked for counsel review.

Short answer. Ask for the named artefact, audit period, scope and source. Request documentation under NDA, then confirm whether a report exists and record its scope and period. If a claim cannot be tied to a source and date, mark it unverified. Plugsky is aligned with SOC 2 and ISO 27001 practices but is not certified; no FedRAMP authorization is claimed.

The four-part test for any claim

A claim in a procurement record needs four fields before it can be relied on: the artefact, the period, the scope and the source. An artefact is a named document such as a data processing agreement, a subprocessor list or an audit report. A period is the date range the artefact covers. A scope is the system or boundary the artefact covers. A source is the body or function that issued it. When one of the four is missing, the honest entry in the record is "not published" or "to be confirmed", not a guess.

This test is deliberately strict about language. Alignment with a set of practices is not the same as certification against them. Readiness is not the same as a completed audit. A regional endpoint is not the same as a contractual residency guarantee. Each distinction matters because a claim that survives into a signed contract becomes an obligation, and one that does not should never have been scored. The security procurement hub groups the adjacent question cluster, and the verification checklist supplies the clause-by-clause version.

Claim-by-claim verification table

Table 1 applies the four-part test to the claim types that appear most often in enterprise AI API reviews. The third column uses only approved wording. The fourth column names what a buyer should not accept as a substitute for evidence.

Table 1. Verification artefacts, approved wording and rejection triggers, checked 20 November 2026.
Claim typeRequest in writingApproved Plugsky wordingDo not accept as proof
SOC 2Current documentation under NDA; confirm report existence, scope and audit periodAligned with SOC 2 practices; not certified; confirm the current report, scope and audit periodA logo, a badge or the word ready used as a synonym for audited
ISO 27001Documentation on request under NDA with scope and periodAligned with ISO 27001 practices; no certification heldAn alignment statement restated as certification
FedRAMPAuthorization boundary and current status from the authorityNo FedRAMP authorization claimedCompliance language or a target milestone reported as achieved
ResidencyNamed region code and controlling DPA termsVirginia, Frankfurt, UAE and Singapore live; Riyadh Enterprise-only; terms contractualA promise that data never leaves a country
RetentionExecuted DPA and written retention and deletion statementDPA terms and EU SCCs published; specific retention mechanics not asserted hereA marketing phrase such as zero retention without a signed clause
SubprocessorsDated list and change-notification processPublished subprocessor tracker; custom terms on EnterpriseAn undated list with no notice obligation
SLASchedule with measurements, exclusions and credits99.9% uptime target; plan-level terms and exclusions apply; Hobby outside the SLA tableA headline percentage with no exclusion list or remedy
BAA / HIPAASigned BAA and review outcomeBAA available by contract, subject to review; not HIPAA certifiedThe phrase HIPAA compliant used as a certification

SOC 2 readiness versus certification

Readiness describes preparation for an audit. Certification or attestation describes a completed examination. A vendor that says it is "SOC 2 ready" is making a statement about its own programme; a vendor that provides an attestation is pointing to a document with a period and a scope. Collapsing the two is the most common error in AI vendor reviews, and it is why a page that publishes a competitor's certified framing must not be read as a statement about Plugsky.

Approved wording — use exactly this. Plugsky is aligned with SOC 2 and ISO 27001 practices but does not hold those certifications; security documentation is available under NDA; buyers should confirm the current report, scope and audit period. No FedRAMP authorization is claimed. This wording is subject to owner and counsel sign-off before any page is published.

No SOC 2 report or attestation was reviewed for this page. The instruction to confirm whether a report exists is deliberate: a buyer should ask, not assume. ISO documentation is available on request under NDA. The facts page carries the precise company and compliance wording, and the security page carries the trust boundary.

FedRAMP is a status, not an adjective

FedRAMP authorization refers to a specific authorization boundary and a current status recorded by the relevant authority. It cannot be inferred from an agency customer, a government-themed landing page, a framework alignment or a dated milestone. Plugsky claims no FedRAMP authorization. If a public page mentions a target milestone, a buyer should re-confirm current status rather than restate the milestone as achieved. The safe procurement entry is "not authorized; confirm current status", with a date beside it.

The same discipline applies to the phrase "EU AI Act compliant". A framework alignment or a documented process is not a certification, and this page does not claim one. Where a buyer needs a formal status, the answer must come from an issued artefact, not from a comparison article. The EU gateway residency comparison separates regional routing evidence from regulatory framing.

Residency claims: name the code, then read the contract

A region claim has two halves. The first is operational: is there a live data plane in the named location? Plugsky's live regions are Virginia (us-east-1), Frankfurt (eu-central-1), UAE (me-central-1) and Singapore (ap-southeast-1); Riyadh is available on Enterprise and is not a self-serve default. The second half is contractual: what does the DPA say about processing, transfer and access? A gateway endpoint in one region and an inference engine in another are different facts, and a support team in a third location is a third fact again. Ask for all three.

Never accept "data never leaves the country" as a substitute. For countries without a live region, the honest options are the nearest live region, a private VPC, on-premises deployment or air-gapped deployment, and the buyer should record which one is being offered. The sovereign AI package describes those boundaries; this page describes how to verify the claim rather than restating it.

Retention, deletion and subprocessors

To prove deletion to an auditor, a buyer needs the executed DPA, the written retention statement and a record of how a deletion request is logged and evidenced. This page does not assert a specific retention period, deletion mechanic or model-training statement beyond the approved fact set; the buyer must obtain them in writing. Where a published page states a breach-notification period or an audit-rights cadence, confirm it in the executed document rather than treating the page as the controlling term.

For subprocessors, request a dated list and a change-notification mechanism. Plugsky publishes an AI subprocessor tracker, and custom sub-processor terms are available on Enterprise. A list without a date is not a control. A BAA is available by contract and subject to review; record it as such, never as a HIPAA certification. The HIPAA BAA feature page is canonical for that wording.

Moving from verification to record

Once each claim has an artefact, period, scope and source, map it to a clause reference in the draft contract. Any answer the vendor will not put in writing stays marked unverified. A completed questionnaire is a claim, not evidence; the evidence is the document behind it. The procurement evidence checker turns a yes or no self-check into a gap list, and the enterprise AI API package explains the commercial framing that surrounds these controls.

How we evaluated this

This is a documentation method, not an audit or a legal opinion. Criteria and relative weight: precision of approved wording 35%, completeness of the four-part test 30%, coverage of claim types 25%, and clarity of unknowns 10%. These weights are this page's editorial method, not third-party data. We checked published security, facts, enterprise and subprocessor pages and read dated third-party procurement pages for claim structure only. Evaluation date: 28 November 2026; canonical baseline checked 20 November 2026. Counsel and owner review are required before publication.

What we did not verify

  • No SOC 2 report or attestation was reviewed; documentation is under NDA and its existence, scope and period must be confirmed.
  • No ISO 27001 certificate, FedRAMP authorization or government accreditation is claimed.
  • No specific retention period, deletion mechanic or model-training statement is asserted.
  • No measured uptime, latency or throughput figure is claimed; 99.9% is a target with terms and exclusions.
  • No competitor price, private quote, certification status or contract term was verified.
  • No enterprise customer name, quote, review or case study is claimed.

Frequently asked questions

How do you verify an LLM vendor's security claims?

Ask for the named artefact, its audit period, its scope and the source that issued it. Request current documentation under NDA, then confirm whether a report exists and record its scope and period. If a claim cannot be tied to a source and a date, mark it unverified.

What does SOC 2 readiness mean versus certification?

Readiness describes work toward an audit; certification or attestation describes a completed one. Plugsky is aligned with SOC 2 and ISO 27001 practices but does not hold those certifications; security documentation is available under NDA; buyers should confirm the current report, scope and audit period.

Can a vendor claim FedRAMP compliance without authorization?

No. FedRAMP authorization is a specific status, not a marketing adjective. Plugsky claims no FedRAMP authorization. Ask for the authorization boundary and the current status from the vendor and the relevant authority; do not accept alignment language as authorization.

How do you prove AI data deletion to an auditor?

Ask for the executed DPA and the written retention and deletion statement, then require the vendor to show how a deletion request is logged and evidenced. This page does not assert a specific retention period, deletion mechanic or model-training statement beyond the approved fact set; buyers must obtain it in writing.

Does a security questionnaire answer count as evidence?

No. A questionnaire is a claim. Attach the underlying document with a date and scope, map it to a contract clause, and treat any answer the vendor will not put in writing as unverified.

Sources and how this was checked

All claim wording on this page uses the approved formulation. Last checked 20 November 2026 for the canonical product baseline; /facts was checked 26 November 2026 and the enterprise page was last updated 25 September 2026.

Related Plugsky reading

Published in the Plugsky blog. Each URL below was checked live and returned HTTP 200 on 28 November 2026:

Next step

Apply the four-part test to your current shortlist, then request documentation under NDA for anything still marked unverified.

Run the evidence check → Request security pack